Operating Procedures for Medium Frequency Furnace

📅 2020-07-11 16:28:19 ✍️ Author:admin 👁️ 612 views
Ready
1.6x

I. Safety Operation Procedures Before Furnace Startup:

1. Before furnace startup, the furnace supervisor and on-duty fitter shall inspect the furnace body, power supply, hydraulic system and cooling system. The on-duty electrician can only be notified to turn on power after all equipment is confirmed to be in good condition.

2. After high-voltage power is supplied, the on-duty distribution electrician at the furnace front shall strictly follow the operation procedures of the medium frequency furnace and operate step by step.

3. When commissioning a new furnace or resuming production after a full month of shutdown, an insulation test shall be performed on the induction coil.

4. Turn on the hydraulic oil pump motor and check whether it can start and work normally.

II. Furnace Start-up Work:

1. When charging, sealed containers and flammable and explosive substances are strictly prohibited from entering the furnace to prevent explosion accidents.

2. Furnace front operators must properly wear personal protective equipment. Reduce the medium-frequency power before charging, and gradually increase it to the rated power after charging is completed. Leaving the post without permission or doing personal work during operation is strictly prohibited. When tapping molten iron, the power supply must be cut off, and tapping steel (iron) with power on is strictly prohibited. Operators shall monitor the operation of the hydraulic pump, and check whether molten iron has splashed to all parts of the basement. If molten iron is found splashed in the basement, it shall be handled promptly to avoid fire.

3. During charging, operators shall add small batches of material frequently. If furnace body freezing occurs, power on for heating is only allowed after the problem is properly handled. Charging from high altitude and overcapacity charging are strictly prohibited to prevent molten iron overflow. Operators shall keep a safe distance during charging to avoid accidents.

4. During the smelting process, on-duty fitters and electricians shall strengthen equipment inspection, detect faults in time and prevent the occurrence of faults.

5. During the use of equipment, once a fault alarm occurs, the on-duty electrician shall be notified for inspection in time. Before the cause of the fault is identified, resetting and power restoration is strictly prohibited, so as to prevent the fault from expanding and resulting in accidents.

6. The on-duty furnace foreman shall closely monitor the changes of the furnace body and furnace wall, handle problems found in time, keep complete records, and strictly prohibit risky operations to prevent the occurrence of major accidents.

7. The water temperature and water pressure alarm systems for the furnace body and power supply system must be inspected and tested regularly to ensure their effective operation.

8. In case of water leakage, arcing or other abnormal conditions inside the furnace body or electric cabinet, repair can only be carried out after the power is disconnected. A warning sign must be posted at the power control unit to prevent misoperation.

9. If a breakout or furnace break-through accident occurs during smelting, you shall first cut off the power supply, shut off the cooling water source, and discharge the molten steel in the furnacequickly into the forehearth pit forpouring (confirm that the forehearth pit is dry in advance).

10. If a sudden power outage occurs during normal production, all operations shall be implemented in strict accordance with the requirements of the emergency production plan.

11. Equipment maintenance personnel shall timely complete routine equipment maintenance and repair work, keep relevant records, and improve the equipment availability rate.

12. Under normal circumstances, the water cooling system remains open. In case of furnace shutdown, after all molten iron is poured out, the water cooling system shall maintain water supply for at least 12 hours until the furnace body is completely cooled.

13. Keep the control room clean and tidy. It is strictly forbidden to bring and consume food in the control room, so as to prevent rodent infestation that may bite off the control panel wiring.